Future Plans

Tasks Planned:

  • Door pins
  • Get speedometer gear corrected
  • Coolant flush
  • Install electric fans
  • Fix visors
  • Fix rear diff leak
  • Body work-patching:
    1) below rear window
    2) corner of rear window
    3) roof pass door
    4) rear quarters
    5) paint chip pass side front hood corner
  • Install new shifter
  • Tasks Completed in 2013:

  • Modify Rally Caps to accommidate longer rear wheel studs
  • Tasks Completed in 2012:

  • Fixed seized Cable for Temperature Control
  • Fixed vacuum problem for Climate Control
  • Replaced burnt out lights in dash
  • Fixed reverse lights
  • Replaced Signal Light switch in column
  • Cleaned up wiring under dash
    - Rewired AutoMeter Gauges
  • Fixed Rocker backing off problem on #6
    - Replaced Rocker, Ball & Nut
    - Set all rockers
  • Installed 6 Pass Transmission Cooler
  • Fixed Wiring around Starter
  • Replaced Starter
  • Replaced Resistance Wire from Fuse Panel to HEI Distributor
  • Fixed Main Electric Wiring & Harness, Replacing/Repairing Poor Connections
  • Installed Rebuilt TH400 Transmission (Built by Nevin Preston)
  • Tasks Completed in 2007-2011:

    Took a break from the car scene, got married and started a family.

  • Installed Trunk Weatherstripping
  • Fixed Drivers Headlight
  • Tasks Completed in 2006:
  • Reupholstering Front & Back seats
  • Replace interior carpet
  • Installed Lakewood Driveshaft Loops
  • Installed longer/larger wheel studs on Rear Axles to accomandate using Slicks
  • Tasks Completed in 2005:
  • Installed Air Gap Intake
  • Installed Holley Carb
  • Added AutoMeter Electric Temp Gauge
  • Added AutoMeter Electric Oil Pressure Gauge
  • Added Vacuum Gauge
  • Changed Temp ground
  • Verified Engine temp on gauge with digital meter
  • Relocated Temperature Sender Unit
  • Removed A/C Condenser
  • Replaced Hood Lamp
  • Replaced Heater Core
  • Trunk liner
  • Fixed drivers taillight ground